Project Details

Project

Project of Borg Al-Arab

Purpose : With a capacity of 100000 m3/day
Owner : Executive Authority for Water and Waste Water Projects.
Main contractor : Societe Egyptienne D'entreprises (Mokhtar Ibrahim)

Supply, erection and testing of:

 - 92 No. of Floating surface aspirating aerator, Power 20hp.

- Metal equipments with value of: 3,590,400 L.E.

- One No. of centrifugal pump with capacity 650 L/S   , H = 80m.

- Complete water hummer system.

- Medium and low tension electrical equipment and cable.

Project Gallery

Project Gallery