Project of Ras Seder

Purpose : With capacity of: 8000 m3/day.
Owner : Construction of Sinai Authority
Main contractor : Arab Contactors (Sinai branch).

Supply, erection and testing the following equipments:

  • 3 No. pumps capacity of each pump 140 L/Sec. for the main station.
  • Emergency diesel generator 700 KVA.
  • 2 No. of dewatering pumps with capacity of each pup 10L/S.
  • Switch board : Are of Iron-clad, floor mounted enclosed type Designed for 380-220V, 50HZ, 